The request for proposal defines the procurement approach for Phase I of the Ares V acquisition. The contract work will include developing products to enable NASA to successfully complete the system requirements review and system definition review, critical milestones in the development of the rocket. Completion of the system definition review will verify the design concept and demonstrate mission objectives can be met.

An RS68 engine undergoes hot-fire testing. Image Credit: Pratt and Whitney Rocketdyne
The solicitation includes five separate work packages available for bid. Work packages one through four include the payload shroud that will protect the Altair lunar lander during launch, the Earth Departure Stage, the core stage, and avionics and software. The products for these work packages include assessing point of departure architecture, assessing risks and opportunities, trade studies and analysis, assessment of NASA requirements and a final report. The fifth work package includes a first stage concept for an upgraded solid rocket fueled booster.
Marshall will manage the contracts, which will be awarded through a full and open competition. The selections will be made in the spring of 2009. The period of performance for each contract is 18 months with two, one-year options.
For more information about the request for proposal, visit: http://prod.nais.nasa.gov/cgi-bin/eps/sol.cgi?acqid=131145#Draft%20Document
Comments